Realisations

Completed projects

Over the years, the portfolio of works completed by us has grown significantly. Here, we share some examples. We can present photographic documentation of other projects excluding details that are confidential.

Glassworks – manufacturer of packaging
for alcohols, cosmetics and perfumes

DEKORGLASS. Palletising stations and a conveyor line

Express pace of a comprehensive assembly carried out simultaneously on 2 levels. Instead of 3 months of work planned by the client, the project was completed within 6 weeks.

Very precise positioning of the production line robotic stations was necessary.
The technological line occupies 2 floors.
Manufacturer of household appliances

ELECTROLUX.
630 A power supply connection wiring

Comprehensive completion of the power supply of the machine park for the household appliances production department and the structural wiring in accordance with the design.

Completion of the 630 A/400 V busbar power supply wiring
Assembly of structural wiring
Wykonanie sieci przyłączy zasilania z szynoprzewodu 630A. Instalacja sieci elektrycznych
Demontaż urządzeń linii produkcyjnej.
Manufacturer of household appliances

BEST POLAND.
Disassambly of the production line

Efficient disassambly of the connection infrastructure of the production line for the engine department.

The works were done without disrupting production on the adjacent line which makes hoods.
Disconnection of the equipment and securing it for transportation to the customer’s designated location.

We guarantee the highest quality

We always ensure that our services are carried out within the agreed time

And often even earlier…

Scroll to Top